Country
Saudi Arabia
State/City
Al Jobail
Sector
Infrastructure
Tasks
Engineering Design
Client
Al Joaib – Royal Commission for Jubail and Yanbu
Status
- Completed
Start
21 June, 2015
End
27 July, 2015
Budget
SWTP-9 Stage-1 Pump Station Rehabilitation Al-jobail, KSA
Integrated Engineers team has been involved as sub-consultant and designer in Pump station rehabilitation project
Project Brief
The exsisting SWTP-9 Stage 1 Pump Station , which is currently used to distribute water within the SWTP 9 , has been upgraded and converted to transmit TSE water to Western District. Upgrade includes rehabilitation of Building, replacement of pumps , power supply , emergency generator and pump control system .
Technical Data
- Pumps : (5) working + (1) standby
Scope of Work
- Electro Mechanical Deisgn for the pump station
- Pipe sizing and material selection.
- Material Take off for all pump station part
- 3D Modelling for the station using different BIM software technology .
- Pump selection .
- 2D Drawings for including 3 views and table of quantity.